Ingula Pumped Storage System

T&T Marine were tasked with excavating and dumping of material, the removal of the provisional berm and re-profile of the spoil areas at the Bramhoek Dam at Ingula Pumped Storage System

This was executed by means of a barge mounted excavator equipped with a dig system, loading the material into 2 Hopper barges and dumping the material in a dermarcated dump site situated within the Bramhoek Dam area

T&T Marine - Projects - Ingula